The second floor

Summer 2008:

The workmen finish the roof, notably the part which overlooks the courtyard.

Spring 2008 :

A lorry equipped with an arm unloads the tons of concrete needed to lay a new slab over the whole of the second floor.

Autumn 2008 :

The restoration of the roof is begun again over the whole of the south wing. The timbers are strengthened and several beams are replaced by ones that look the same.

Autumn 2007 :

A huge building operation begins, with the aim of creating 16 cells and two common rooms in the 1,000 square metres of the second floor.